Rapid Mobilization Launch & Recovery System

Okeanus by 

The fully integrated system, designed and built to launch and recover a free-flying ROV, contains a winch / level wind assembly, self-erecting A-Frame, docking head / over-boarding sheave assembly and electro-hydraulic power unit, all mounted to a single skid. This innovative design allows the entire system to be placed into an ISO flat rack for ease of transport and deployment. To further facilitate rapid mobilization, the ROV is stored on the skid assembly during transport.

More in this category: ECO Sheave »